|
The relevant trades must have performed the following preparatory work before any tiles can be
laid.
Brickwork
- All relevant brickworks complete.
Carpenter
- Ridge and hip boards fixed flush with rafters.
- Fascia (or tilt batten) fitted.
- Barge board fitted.
- Verge strip fitted (if required for bedding).
- Gable sheeting and flashing fitted for dutch gables.
- Anti-ponding boards fitted (if required).
- Lining boards and counter-battens fitted (for exposed rafters).
Plumber
- Valley irons and gutters fitted.
- Secret gutters and flashings fitted (if required).
|