|
Brickwork on the gable ends should finish flush to the under side of the tile batten and should be cut to a straight level line over the full lenght of the gable. When tiles are to be bedded on top or the brickwork, a header course of bricks on top of the cut course gives a neater, professional finish. In an exposed beam construction, where ceilings are fixed on tip of the rafters, an allowance should be made for the extra height. |